Greenbriar at Marlboro

Greenbriar at Marlboro hired Design Alternatives to renovate the clubhouse ballroom, lobby, corridors and vestibules at its active-adult community in Marlboro, NJ. DA handled the design, procurement and installation, and managed the work from 250 new banquet chairs, chandeliers, an engineered-wood dance floor and stage drapery in the ballroom to a porcelain-clad fireplace, custom shelving and a counter-height banquette in the lobby.

Project Details

Location

Marlboro, NJ

Project Type

Renovation

Completed

2025

Planning a similar renovation?

Client Perspective

In Their Words

Case Study

Greenbriar at Marlboro Ballroom & Lobby

  1. From the front door to the dance floor: Ballroom, lobby, main and rear corridors, and both vestibules designed as one clubhouse program
  2. One team from concept to install: Full-service interior design, construction documents, procurement, installation and construction management
  3. 250 new banquet chairs: A complete ballroom seating package, with a handcart for setup and storage

Greenbriar at Marlboro, an active-adult community in Marlboro, NJ, hired Design Alternatives to renovate its clubhouse ballroom and lobby. That meant the ballroom, lobby, corridors and vestibules where residents arrive, gather and celebrate.

  • Ballroom: 250 banquet chairs, chandeliers and sconces, picture-frame trim, carpet tile, an engineered-wood dance floor, paint, and new stair treatment, drapery and valances at the stage
  • Lobby and main corridor: seating and a custom counter-height banquette, a porcelain-clad fireplace with custom shelves, artwork and a mirror, decorative lighting and trim, and tile floors with an inset carpet area
  • Corridors and vestibules: rear-corridor finishes, a logo mat at the front vestibule and privacy film at the rear vestibule

The lobby was planned as a place to gather, not just walk through. The counter-height banquette and the fireplace with its custom shelving give residents a spot to settle in on the way into the ballroom. The fireplace went through extra renderings and coordination before it was finalized.

The goal

Objective

Our approach

The Solution

Our process

Process

The result

Outcome