Heritage Point

Heritage Point HOA hired Design Alternatives to renovate the ballroom at 44 Heritage Point Boulevard in Barnegat, NJ. DA coordinated the renovation and took on the finishes, millwork and window treatments, working with specialist trades for the flooring, electrical, painting and countertop.

Project Details

Location

Barnegat, NJ

Project Type

Renovation

Completed

2018

Planning a similar renovation?

Client Perspective

In Their Words

Case Study

Heritage Point Ballroom & Overlook Room

  1. Two rooms, one event space: Opened the ballroom up to the adjoining overlook room, with drapery, lighting, millwork and finishes carried across both
  2. One team coordinating every trade: Interior design, finishes, millwork and window treatments, coordinated with flooring, electrical, painting and countertop specialists
  3. A five-week closure window: Ballroom work scheduled from June 25 through July 27, 2018, with every trade sequenced inside that window

Heritage Point HOA in Barnegat, NJ, hired Design Alternatives to renovate the ballroom at 44 Heritage Point Boulevard, the community’s main event room, and join it to the overlook room and kitchen next door.

  • Ballroom and overlook room: header and adjoining walls removed to open the connection, new wallpaper, picture-box millwork, shades, and drapery with hardware
  • Flooring: custom printed Shaw carpet in the ballroom and pre-function area, a replacement wood dance floor, and new flooring with a small tiled area by the kitchen
  • Lighting and finishes: four chandeliers and ten sconces with updated outlets and switching, painted trim, ceiling and trusses, shutters between the kitchen and ballroom, and a new kitchen countertop

The trim color was matched to the existing lobby, so the ballroom reads as part of the same building rather than a separate project. The room had to close to residents while the work happened, so the schedule was built around that. The association cleared the furniture and kitchen and handled the cameras, controls and speakers. Electrical started the first week, painting followed in early July, the countertop went in mid-month and window treatments came last.

The goal

Objective

Our approach

The Solution

Our process

Process

The result

Outcome