Ramada Inn Toms River

Hotels Unlimited brought in Design Alternatives repeatedly between 2007 and 2018 to renovate the Ramada Inn Toms River, a hotel and event destination in Toms River, NJ. DA handled the design, procurement and coordination, and delivered work ranging from custom chandeliers, a maple dance floor and a stone focal wall in the ballroom to new headboards, casegoods and window treatments in the guest rooms and suites.

Project Details

Location

Toms River, NJ

Project Type

Renovation

Completed

2018

Planning a similar renovation?

Client Perspective

In Their Words

Case Study

Ramada Inn Toms River (2007–2018)

  1. More than a decade of repeat work: Assignments from 2007 to 2018 covering the ballroom, event room, lobby, restaurant, guest rooms, suites and bridal suite
  2. From drawings to delivery: Interior design, finish and furniture selection, specifications, procurement and contractor coordination, with DA installing selected work itself

Between 2007 and 2018, Hotels Unlimited repeatedly called on Design Alternatives to update the Ramada Inn Toms River, a hotel and event destination in Toms River, NJ. Taking one assignment at a time, DA worked through the property’s event spaces, its shared areas, and the rooms and suites where guests stayed overnight.

  • Grand Ballroom and Veranda (2007–2008): decorative millwork and mirrors, custom chandeliers, a maple dance floor, room-divider drapery, a new bar and a stone focal wall
  • Guest rooms and bridal suite (2013–2014): coordinated casegoods, window treatments, lamps, mirrors and artwork, with the bridal suite individually designed around a custom paneled headboard and layered drapery
  • Suites (2014–2015): new casegoods and layered window treatments in the 600 Building, plus sleeper sofas upholstered to match each building’s existing seating and new flooring in six suites
  • Lobby, restaurant and later updates (2014–2017): new lobby seating and tables, a restaurant accent wall, refreshed ballroom finishes with picture-frame molding, and plank flooring in the 500 Building suite corridors

Much of the work came down to making new pieces fit rooms that were already in use. Window treatments were measured room by room, and support boards went in so drapery tracks could be mounted to the ceiling. In the original ballroom renovation, DA handled the tile, painting and decorative millwork itself while coordinating the specialty trades for carpet, flooring, stone, window treatments and electrical. During the 2017 corridor installation, pulling the old carpet base marked the lower walls. The crew patched and primed them, prepared the outside corners and corner guards, and split across both floors with longer days to keep the work moving.

The goal

Objective

Our approach

The Solution

Our process

Process

The result

Outcome

Explore More Projects

UMC at Bristol Glen

design-build

Westlake Ballroom Final

Westlake Golf & Country Club

design-build

Elements at West Windsor

design-build