Project Overview
- Four buildings, one design program: Coordinated carpet, lighting, paint, furnishings and art across the lobbies and corridors of Buildings 1–4
- One team from concept to install: Interior design, procurement, furnishings and art, lighting, flooring, painting and construction oversight
- More than 12,000 sf of new carpet: Installed through the corridors and lobbies, with association sign-off on painting and carpeting in July 2025
Water’s Edge at Point Pleasant, a condominium association on River Road in Point Pleasant, NJ, hired Design Alternatives to renovate the shared spaces across its four buildings. That meant the vestibules, elevator lobbies and upper-floor corridors that residents pass through every day.
- Building 4: new corridor and lobby carpet, lighting, a bench and tables, artwork, painted walls, trim and ceilings, and a tiled elevator lobby
- Buildings 1–3: new corridor and lobby carpet, light fixtures, upholstered chairs, tables and chests, artwork, and fresh paint after wallpaper removal
- Vestibule tile with inset logo mats, plus wall protection in the mailbox areas
The upper floors of each building are laid out differently, so the design had to adapt from one building to the next while still reading as one community. When the team lifted the existing carpet in Buildings 1–3 and found glued-down foam underneath, they added its removal to the scope before the new carpet went in. The construction punchlist was finished June 20, 2025, and the association approved the painting and carpeting that July.